Engineering Technical Reports (ETR) | 147 | Issue 1 (New) | Power Quality Information Required for Heat Pumps and their Assessment
| Apr 2025 | Q1 2030 | Current | £Free | Add to Order |
Engineering Recommendations (EREC) | G101 | Issue 2 (Revision) | Voltage Measurements for Assessment of Compliance with Statutory Voltage Limits
| Mar 2025 | | Current | £Free | Add to Order |
Engineering Recommendations (EREC) | G43 | Issue 5 (Revision) | Instructions for Reporting to the National Fault and Interruption Reporting Scheme
| Mar 2025 | | Current | £Free | Add to Order |
Engineering Recommendations (EREC) | G76 | Issue 3 (Revision) | Guide to the practical aspects of quality management associated with assessment of power system plant & products
| Mar 2025 | | Current | £90.00 | Add to Order |
Engineering Recommendations (EREC) | G79 2D | Issue 4 (Revision) | Guide to the assessment of power system products for use by the ENA Member Companies
Part 2D: Procedure for the conformity assessment of protection products
| Mar 2025 | | Current | £Free | Add to Order |
Engineering Recommendations (EREC) | G98 | Issue 2 (Revision) | Requirements for the connection of Fully Type Tested Micro-generators (up to and including 16 A per phase) in parallel with public Low Voltage Distribution Networks on or after 27 April 2019
| Mar 2025 | | Current | £Free | Add to Order |
Engineering Recommendations (EREC) | G98 Forms | Issue 1 (New) | EREC G98 Application Forms
| Mar 2025 | | Current | £Free | Add to Order |
Engineering Reports (EREP) | G98/99 | Issue 2 (Revision) | Distributed Generation Connection Guide: G98 & G99
| Mar 2025 | Q1 2026 | Current | £Free | Add to Order |
Engineering Recommendations (EREC) | G99 | Issue 2 (Revision) | Requirements for the connection of generation equipment in parallel with public distribution networks on or after 27 April 2019
| Mar 2025 | | Current | £Free | Add to Order |
Engineering Recommendations (EREC) | G99 Forms | Issue 1 (New) | EREC G99 Application Forms
| Mar 2025 | | Current | £Free | Add to Order |
Engineering Recommendations (EREC) | L44 | Issue 2 (Revision) | Separation between Wind Turbines and Overhead Lines: Principles of Good Practice
| Mar 2025 | | Current | £45.00 | Add to Order |
Engineering Recommendations (EREC) | TELE 3 | Issue 2 (Revision) | Code of practice for overhead to underground optical cable connections
| Mar 2025 | | Current | £55.00 | Add to Order |
Engineering Recommendations (EREC) | TELE 4 | Issue 2 (Revision) | Code of practice for the installation of ADSS optical cable
| Mar 2025 | | Current | £45.00 | Add to Order |
Technical Specifications (TS) | 48-6-10 | Issue 1 (New) | Testing approach for merging units for protection sampling of instrument transformers in accordance with BS EN IEC 61869-13
| Jan 2025 | Q1 2030 | Current | £45.00 | Add to Order |
Engineering Recommendations (EREC) | EB/TP | Issue 4 (Revision) | Telecommunication Providers and Distribution Network Operators joint use of poles
| Jan 2025 | Q1 2030 | Current | £90.00 | Add to Order |
Engineering Recommendations (EREC) | G99 SAF | Issue 1 (New) | Standard Application Form - Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99
| Jan 2025 | | Current | £Free | Add to Order |
Engineering Technical Reports (ETR) | 001 | Issue 1 (New) | Generation Sharing Guidance
| Oct 2024 | Q2 2025 | Current | £Free | Add to Order |
Open Networks Processes (ON Proc) | 001 | Issue 1 (New) | Standard Pre-Qualification Procurement Process for Flexibility Services
| Jul 2024 | Q4 2026 | Current | £Free | Add to Order |
Technical Specifications (TS) | 09-06 | Issue 10 (Revision) | Auxiliary multicore and multipair cables
| Jul 2024 | Q1 2029 | Current | £105.00 | Add to Order |
Technical Specifications (TS) | 43-14 | Issue 4 (Revision) | Insulated Aerial Bundled Conductors For Low Voltage Overhead Distribution Systems – Conductor Fittings and Associated Apparatus
| Jul 2024 | Q1 2034 | Current | £80.00 | Add to Order |
Technical Specifications (TS) | 43-15 | Issue 4 (Revision) | Insulator Binds and Equivalent Helical Fittings for Overhead Lines
| Jul 2024 | Q2 2029 | Current | £80.00 | Add to Order |
Technical Specifications (TS) | 35-3 | Issue 3 (Revision) | Continuous Maximum Rated (CMR) system transformers (for use on systems up to 132 kV)
| May 2024 | Q1 2029 | Current | £105.00 | Add to Order |
Technical Specifications (TS) | 35-7 | Issue 3 (Revision) | Tap-changers for system voltages up to and including 132kV
| May 2024 | Q4 2029 | Current | £80.00 | Add to Order |
Technical Specifications (TS) | 09-11 | Issue 3 (Revision) | Low voltage heat-shrinkable material components for use up to and including 600/1 000 V
| 2024 | | Current | £80.00 | Add to Order |
Engineering Reports (EREP) | 144 | Issue 1 (New) | DNO Common Network Asset Indices Methodology V2.1: Health & Criticality
| 2024 | Q4 2028 | Current | £Free | Add to Order |
Engineering Reports (EREP) | 145 | Issue 1 (New) | Good Practice Guide to DNO Common Network Asset Indices Methodology V2.1
| 2024 | Q4 2028 | Current | £Free | Add to Order |
Engineering Reports (EREP) | 146 | Issue 1 (New) | DNO CNAIM V2.0: Methodology Changes Explained
| 2024 | Q4 2028 | Current | £Free | Add to Order |
Technical Specifications (TS) | 35-2 | Issue 7 (Revision) | Emergency rated system transformers 66/20.5 kV, 66/11.5 kV and 33/11.5 kV delta/star and star/star connected
| 2024 | | Current | £105.00 | Add to Order |
Technical Specifications (TS) | 41-18 | Issue 3 (Revision) | Partial discharge testing of bushings, capacitors, instrument transformers and switchgear of rated voltage 7.2 - 420 kV inclusive
| 2024 | Q1 2030 | Current | £45.00 | Add to Order |
Technical Specifications (TS) | 43-103 | Issue 4 (Revision) | Low voltage overhead line shrouding materials
| 2024 | | Current | £80.00 | Add to Order |
Technical Specifications (TS) | 43-13 | Issue 4 (Revision) | Aerial Bundled Conductors Insulated with Cross-Linked Polyethylene for Low Voltage Overhead Distribution
| 2024 | | Current | £20.00 | Add to Order |
Technical Specifications (TS) | 43-7 | Issue 5 (Revision) | 132 kV steel tower transmission lines: Specification L4(m)
| 2024 | Q1 2030 | Current | £285.00 | Add to Order |
Technical Specifications (TS) | 43-96 | Issue 3 (Revision) | Fasteners and Washers for Wood Pole Overhead Lines
| 2024 | Q1 2030 | Current | £45.00 | Add to Order |
Technical Specifications (TS) | 48-2 | Issue 3 (Revision) | Fault Passage Indicators up to 132kV for Underground and Overhead Distribution Systems
| 2024 | | Current | £65.00 | Add to Order |
Engineering Recommendations (EREC) | G38 | Issue 2 (Revision) | Operational procedure associated with electricity supplies for traction purposes on AC and DC electrified lines
| 2024 | | Current | £65.00 | Add to Order |
Engineering Recommendations (EREC) | G44 | Issue 4 (Revision) | Code of practice for the coordination of power line carrier system frequencies in the range 30•0 kHz to 526•5 kHz
| 2024 | | Current | £55.00 | Add to Order |
Engineering Recommendations (EREC) | G59/3/8 | Issue 3 (Revision) | Issue 3 - Amendment 8
Recommendations for the Connection of Generating Plant to the Distribution Systems of Licensed Distribution Network Operators
| 2024 | | Current | £Free | Add to Order |
Engineering Recommendations (EREC) | G80 | Issue 4 (Revision) | Recommendations for the safe working of utilities’ staff and other parties near light rapid transit systems
| 2024 | | Current | £55.00 | Add to Order |
Engineering Recommendations (EREC) | G99 A10 | Issue 1 (New) | Issue 1 – Amendment 10
Requirements for the connection of generation equipment in parallel with public distribution networks on or after 27 April 2019
| 2024 | | Current | £Free | Add to Order |